The Development of The Alternative Dispute Resolution in Indonesia

Penulis
Prof. Sarwono Hardjomuljadi

Penerbit
-

Tahun Terbit
2017

Subyek
-

Abstraks
Dalam Kegiatan Diskusi Publik Dewan Sengketa Bidang Konstruksi

FIDIC Conditions of Contract, Clause 3.5 Engineer Determination:

If the Contractor fails to give notice of a claim within such period of 28 days, the Time for Completion shall not be extended, the Contractor shall not be entitled to additional payment, and the Employer shall be discharged from all liability in connection with the claim.